Construction Contracts
How to Manage Contracts and Control Disputes in a Volatile Industry
Edward Whitticks(Autor*in)
Elsevier (Verlag)
Erschienen am 25. November 2013
305 Seiten
978-0-12-799973-9 (ISBN)
Systemvoraussetzungen
für ePUB mit Wasserzeichen-DRM
E-Book Einzellizenz
Bei dem Kauf dieses E-Books erwerben Sie eine Einzel-Lizenz für eine natürliche Person, die nicht übertragbar ist. [L]
Als Download verfügbar
Beschreibung
In this superb new volume, Edward Whitticks has charted the course for anyone working with contracts and dispute control in oil and gas, one of the most volatile industries in the world. His practical, straightforward approach will move you step by step through the process of contractual negotiations, bids and closeouts. For anyone working in the oil and gas industry today, finding your way through the maze of contract management seems more cutthroat and challenging than ever before. In Construction Contracts, Edward Whitticks dispels the myth that "there has to be a winner and a loser in contractual management and dispute control. As a desktop companion for project managers and engineers, contract administrators, cost scheduling engineers and others engaged in the field of refinery, pipeline and petrochemical construction, this book covers the entire contract process.
Weitere Details
Sprache
Englisch
Verlagsort
Austin
USA
ISBN-13
978-0-12-799973-9 (9780127999739)
Schweitzer Klassifikation
Weitere Ausgaben
Inhalt
Preface
Chapter 1: Client Policy and Practice
1.1 Introduction
1.2 The Fundamental Contract Document
1.3 Invitations to Bid
1.4 Lump Sum Contracting Preferred
1.5 Lump Sum Plus Unit Rates
1.6 Unit Rate Only
1.7 Reimbursable Cost Contracts Where Necessary
1.8 Cost Plus a Percentage Fee
1.9 Start Cost Reimbursable with Later Conversion to Lump Sum
1.10 Provisional Contract Price Agreement
1.11 Target Cost (Shared Overrun or Underrun)
1.12 Partnering
1.13 Prime Contracts
1.14 Professional Services Contracts
1.15 Short Form Contracts
1.16 Incentive Plans
1.17 Policy on Claims
1.18 Quality and "Intent of Contracts
1.19 Field Administration of Contracts
1.20 Planning Policies
1.21 Integration
1.22 Governmental Policies and Influences-The "Third Party
Chapter 2: The Bid Package
2.1 Preparation by the Client's Team
2.2 Errors and Omissions
2.3 What Type of Contract?
2.4 Job Explanation Meeting
2.5 Site Visit
2.6 Bid Package Worksheets
Chapter 3: Bid Preparation
3.1 Bidders' Responses to the Invitation to Tender
3.2 Articles of Agreement or General Terms and Conditions
3.3 Scope of Work
3.4 Has It Been Done Before?
3.5 Changes to the Scope of Work
3.6 Schedule
3.7 Compensation
3.8 Materials
3.9 Specifications and Drawings
3.10 As Built Documentation
3.11 Bid Preparation in General: Alternative Proposals
3.12 Subcontractors
Chapter 4: Evaluation
4.1 Reception and Examination of the Bids
4.2 The Bid Clarification Meeting
4.3 Low Bidding
4.4 Bids Above the Company Estimate
4.5 Unit Rates for Work Variations
4.6 General Observations
Chapter 5: Procedures
5.1 Client's Procedures
5.2 Project Coordination Procedures (A Typical Client Issue)
5.3 Contractor's Procedures: The Work Procedure
Chapter 6: Contracts Management
6.1 The Contract Manager
6.2 The Contract Engineer
6.3 The Client's Team
6.4 Distribution of the Contract
6.5 Execution
6.6 Mobilization
6.7 The Kick-off Meeting
6.8 Indemnity and Insurance
6.9 Liquidated Damages
6.10 Progress Reporting
6.11 Contractor Scheduling Requirements
6.12 The Change Order
6.13 The Negative Change Order
6.14 The Change Order Closeout Form
6.15 The Work Order
6.16 The Amendment
6.17 The Short Form Contract
6.18 Completion and Acceptance
6.19 Mechanical Completion
6.20 Substantial Completion
6.21 Standardization
6.22 Contract Management Policy
6.23 The Contract
6.24 Contract Documents
6.25 Conclusion on Model Contracts and Procedure Standardization
6.26 Conflict of Interest
6.27 The Diplomatic Brush-off
Chapter 7: Claims
7.1 Construction Claims
7.2 A Claim by Any Other Name
7.3 The Breeding Ground-Source of Claims before Contract Award
7.4 After Contract Award
7.5 Types of Construction Claims
7.6 Claim Review
7.7 Contractor Tenacity in Claims Promotion
7.8 Change Order and Claims Meetings
7.9 Contractor's Claims Preparation and Presentation
7.10 Claim Preparation-The Claims Consultant
7.11 Arbitration
7.12 Negotiation Meetings
7.13 Computer-Aided Quantification of Delay and Disruption Costs
Chapter 8: Payments and Contract Closeout
8.1 Invoicing and Verification
8.2 Work Breakdown Structure
8.3 Measurement of Progress
8.4 Retention
8.5 Warranty Period
8.6 Contract Closeout
8.7 Contract Closeout Checklist
8.8 Contract Closeout Report
Chapter 9: Workshop Exercises
9.1 Vagaries in Contract Language-Claim 1 Installation of Pipelines in a Tunnel
9.2 Contract Intent-Claim 2
9.3 Direct and Consequential Costs-Claim 3
9.4 Extra Work Dispute-Claim 4
9.5 The Great Asphalt Robbery-Claim 5
9.6 The Reimbursable Cost Offshore Bonanza-Claim 6
9.7 The "Life of the Contract-Claim 7 Caused by: Disagreement over Hourly Labor Rates
9.8 Unproven Technology-Claim 8 Caused by: Lump Sum Format Without Preengineering
Chapter 10: Manuals and Models
10.1 The Quality Manual
10.2 The Project Proposal
10.3 The Project Record Book
10.4 The Construction Control Plan
10.5 Appendix 1 Model Contract Document
10.6 Appendix 2 Contract Amendments
10.
Systemvoraussetzungen
Dateiformat: ePUB
Kopierschutz: Wasserzeichen-DRM (Digital Rights Management)
Systemvoraussetzungen:
- Computer (Windows; MacOS X; Linux): Verwenden Sie eine Lese-Software, die das Dateiformat ePUB verarbeiten kann: z.B. Adobe Digital Editions oder FBReader – beide kostenlos (siehe E-Book Hilfe).
- Tablet/Smartphone (Android; iOS): Installieren Sie die App Adobe Digital Editions oder eine andere Leseapp für E-Books, z.B. PocketBook (siehe E-Book Hilfe).
- E-Book-Reader: Bookeen, Kobo, Pocketbook, Sony, Tolino u.v.a.m.
Das Dateiformat ePUB ist sehr gut für Romane und Sachbücher geeignet - also für „fließenden” Text ohne komplexes Layout. Bei E-Readern oder Smartphones passt sich der Zeilen- und Seitenumbruch automatisch den kleinen Displays an.
Mit Wasserzeichen-DRM wird hier ein „weicher” Kopierschutz verwendet. Daher ist technisch zwar alles möglich – sogar eine unzulässige Weitergabe. Aber an sichtbaren und unsichtbaren Stellen wird der Käufer des E-Books als Wasserzeichen hinterlegt, sodass im Falle eines Missbrauchs die Spur zurückverfolgt werden kann.
Weitere Informationen finden Sie in unserer E-Book Hilfe.