From the Book - Preface:
This manual has been compiled to provide time frames, labor crews and equipment spreads to assist the estimator in capsulizing an estimate for the installation of cross-country pipelines, marshland pipelines, nearshore and surf zone pipelines, submerged pipelines, wharfs, jetties, dock facilities, single-point morring terminals, offshore drilling and production platforms and equipment and appurtenances installed thereon.
The time frames and labor and equipment spreads which appear throughout this manual are the result of many time and method studies conducted under varied conditions and at locations throughout the world; these time frames and labor and equipment spreads reflect a complete, unbiased view of all operations involved.
When one is engaged in compiling an estimate from any information furnished by others, as is the case with this manual, he should view it in an objective light, giving due consideration to the nature of the project at hand and evaluating all items that may affect the productivity of labor and all other elements involved.
Sprache
Verlagsort
Verlagsgruppe
Elsevier Science & Technology
Zielgruppe
Maße
Höhe: 235 mm
Breite: 152 mm
Gewicht
ISBN-13
978-0-87201-157-1 (9780872011571)
Copyright in bibliographic data and cover images is held by Nielsen Book Services Limited or by the publishers or by their respective licensors: all rights reserved.
Schweitzer Klassifikation
Autor*in
John S. Page has worked for some of the largest construction firms in the world. He has a BS in civil engineering from the University of Arkansas and received the Award of Merit from the American Association of Cost Engineers.
Time frames. Labor crews. Equipment spreads. Cross-country pipelines. Marshland pipelines. Nearshore/surf-zone pipelines. Submerged pipelines. Wharves. Jetties. Dock facilities. Single-point mooring terminals. Offshore drilling and production platforms