
Perspectives in Modern Project Scheduling
Description
Alles über E-Books | Antworten auf Fragen rund um E-Books, Kopierschutz und Dateiformate finden Sie in unserem Info- & Hilfebereich.
Operations Research began with the mathematical scheduling of a massive project-logistically supplying Europe with military equipment and goods during the WWII. Today project scheduling research continues growing in a variety of its theoretical models, in its magnitude and application. As the world becomes more interrelated and complex, the wider its research is applied to an increasing number of project scheduling problems.
Project Scheduling: Surveying the State-of-the-Art surveys the current state-of-the-art in operations research with chapters written by the respective leading experts on each topic. It covers the range of the key models in the field, including deterministic, probabilistic, single- and multi-mode, single- and multi-objective, and a general model on discrete-continuous resources. Recent solution algorithms are systematical examined. The book summarize sthe current developments and theoretical achievements in the field, including project uncertainty and grid resource management.
More details
Other editions
Additional editions

Content
System requirements
File format: PDF
Copy protection: Watermark-DRM (Digital Rights Management)
System requirements:
- Computer (Windows; MacOS X; Linux): Use the free software Adobe Reader, Adobe Digital Editions, or any other PDF viewer of your choice (see eBook Help).
- Tablet/Smartphone (Android; iOS): Install the free app Adobe Digital Editions or another reading app for eBooks, e.g., PocketBook (see eBook Help).
- E-reader: Bookeen, Kobo, Pocketbook, Sony, Tolino and many more (only limited: Kindle).
The file format PDF always displays a book page identically on any hardware. This makes PDF suitable for complex layouts such as those used in textbooks and reference books (images, tables, columns, footnotes). Unfortunately, on the small screens of e-readers or smartphones, PDFs are rather annoying, requiring too much scrolling.
This eBook uses Watermark-DRM, a „soft” copy protection. This means that there are no technical restrictions to prevent illegal distribution. However, there is a personalised watermark embedded in the eBook that can be used to identify the purchaser of the eBook in the event of misuse and to provide evidence for legal purposes.
For more information, see our eBook Help page.