Manage a construction programme from start to finish with this up-to-date guide
The maturation and proliferation of project management principles has been one of the most important stories in recent business history. So widely has project management spread throughout the corporate world that it has now given way to a similar discipline, programme management, designed to align, coordinate and manage a number of related projects as a whole. In the construction industry particularly, programme management can deliver benefits that would not have been possible to realise had individual projects been managed independently.
Produced by the Chartered Institute of Building (CIOB), the revised Code of Practice for Programme Management in the Built Environment provides a comprehensive overview of the tools required to deliver such benefits, and how they are applied in construction programmes. A natural complement to the CIOB's popular Code of Practice for Project Management for the Built Environment, it is now fully updated to reflect new insights and best practices.
Readers of the second edition of Code of Practice for Programme Management in the Built Environment will find:
* Theoretical and practical insights derived from research and experience
* Coverage of setting up programmes successfully so that teams feel confident to deliver the final outcome
* Guidelines for implementing programme management for the built environment
Code of Practice for Programme Management in the Built Environment is ideal for programme management and project management professionals involved in this industry and in particular, contractors and client organisations, as well as for advanced undergraduate and postgraduate students in construction project management and other related disciplines.
The Chartered Institute of Building is the world's largest professional body for construction management and leadership. It has a Royal Charter to promote the science and practice of building and construction for the benefit of society. Members across the world work in the development, conservation, and improvement of the built environment.
More details
Other editions
Additional editions

Person
The Chartered Institute of Building is the world's largest professional body for construction management and leadership. It has a Royal Charter to promote the science and practice of building and construction for the benefit of society. Members across the world work in the development, conservation, and improvement of the built environment.
Content
Foreword xiii
Acknowledgements xv
List of Figures xvii
Working Group (WG) of the Code of Practice for Programme Management xix
Glossary xxi
CHAPTER 1 Programme Management in Context 1
1.1 Introduction 1
1.1.1 Need for programme management in the built environment 2
1.1.2 Future programme management in the built environment 3
1.1.3 Core themes that must be integrated 5
1.1.4 Developing capability 6
1.1.5 Procuring value 6
1.1.6 Digitalisation, visualisation and data 7
1.1.7 Cultural identity and ethics 8
1.1.8 Sustainability and its governance 8
1.1.9 Platform thinking and modern methods of construction 9
1.2 Applying programme management in practice 10
1.2.1 Introduction to programme management 10
1.2.2 Types of programmes 10
1.2.3 Programme management process and stages 12
1.3 Programme organisation 12
1.3.1 Types of clients who may initiate programmes 13
1.3.2 Key programme management roles 14
1.3.3 Programme sponsor 14
1.3.4 Programme sponsor's board 15
1.3.5 Programme manager 15
1.3.6 Programme management board 15
1.3.7 Programme management office 15
1.3.8 Wider programme management team 16
1.3.9 Stakeholders 16
1.3.10 Portfolio management 17
CHAPTER 2 Stage A: Inception 19
2.1 Purpose of this stage 19
2.2 Key activities of this stage 19
2.2.1 Vision statement 19
2.2.2 Programme mandate 20
2.2.3 Managing strategic change 20
2.3 Key roles and responsibilities of this stage 25
2.3.1 Client organisation 25
2.3.2 Business partners and funders 26
2.3.3 Programme sponsor 26
2.3.4 Programme sponsor's board 26
CHAPTER 3 Stage B: Initiation 29
3.1 Purpose of this stage 29
3.2 Key activities of this stage 29
3.2.1 Programme brief 29
3.2.2 Programme business case 30
3.2.3 Benefits management 31
3.2.4 Feasibility study 32
3.2.5 Funding arrangements 33
3.3 Key roles and responsibilities of this stage 34
3.3.1 Programme sponsor's board 34
3.3.2 Programme business change manager 35
3.3.3 Programme manager 35
CHAPTER 4 Stage C: Definition 37
4.1 Purpose of this stage 37
4.2 Key activities at this stage 37
4.2.1 Benefits profiles 37
4.2.2 Scope definition 37
4.2.3 Scope of undertaking 38
4.2.4 Stakeholder analysis 39
4.2.5 Risk, opportunities, issues, assumptions and constraints 39
4.2.6 Programme timescale plan 40
4.2.7 Programme controls 40
4.2.8 Programme financial plan 40
4.2.9 Transition plan 42
4.2.10 Programme delivery plan 43
4.2.11 Establishing the programme organisation 43
4.2.12 Benefits management 44
4.2.13 Change management 44
4.2.14 Assurance and audits 44
4.2.15 Transition 44
4.2.16 Stakeholder analysis 44
4.2.17 External environment and relationships 45
4.2.18 Scope management 45
4.2.19 Risk management 47
4.2.20 Reference class forecasting 49
4.2.21 Programme schedule and risks 50
4.2.22 Programme governance 50
4.2.23 Issues management 53
4.2.24 Time scheduling 53
4.2.25 Financial management 54
4.2.26 Cost management 55
4.2.27 Change control 60
4.2.28 Information management 60
4.2.29 Integration 61
4.2.30 Communication management 62
4.2.31 Quality management 63
4.2.32 Procurement and commercial management 63
4.2.33 Resources management 65
4.2.34 Health and safety management 66
4.2.35 Sustainability/environmental management 66
4.3 Key roles and responsibilities of this stage 67
4.3.1 Programme sponsor's board 67
4.3.2 Programme sponsor 67
4.3.3 Business change manager 67
4.3.4 Benefits realisation manager 68
4.3.5 Programme manager 68
4.3.6 Programme financial manager 69
4.3.7 Programme management board 69
4.3.8 Stakeholder/communications manager 69
4.3.9 Programme management office 70
CHAPTER 5 Stage D: Implementation 73
5.1 Purpose of this stage 73
5.2 Key activities of this stage 73
5.2.1 Initiate projects 74
5.2.2 Performance monitoring and control 74
5.2.3 Reporting 75
5.2.4 Project closure 75
5.2.5 Construction procurement methods 75
5.2.6 Measuring progress 75
5.2.7 Data collection and analysis 75
5.2.8 Data management 76
5.2.9 Monitoring progress 76
5.2.10 Managing multiple projects 79
5.2.11 Reporting and forecasting 79
5.2.12 Programme delivery plan 79
5.2.13 Benefits management 81
5.2.14 Business case management 81
5.2.15 Performance monitoring, control and reporting 81
5.2.16 Correct use of graphics 82
5.2.17 Risk and issue management 84
5.2.18 Financial management 86
5.2.19 Change management 86
5.2.20 Time management 87
5.2.21 Information management 87
5.2.22 Stakeholder/communications management 87
5.2.23 Quality management 88
5.2.24 Procurement and commercial management 88
5.2.25 Health and safety management 89
5.2.26 Sustainability/environmental management 89
5.2.27 Transition management - projects closure 89
5.3 Key roles and responsibilities of this stage 90
5.3.1 Programme sponsor's board 90
5.3.2 Programme sponsor 90
5.3.3 Programme business change manager 90
5.3.4 Programme benefits realisation manager 91
5.3.5 Programme manager 91
5.3.6 Programme financial manager 91
5.3.7 Programme management board 92
5.3.8 Stakeholder/communications manager 92
5.3.9 Programme management office 92
5.3.10 Project management structures 93
5.3.11 Key points of contact 94
CHAPTER 6 Stage E: Benefits Realisation and Transition 95
6.1 Purpose of this stage 95
6.2 Key activities of this stage 95
6.2.1 Benefits review 95
6.2.2 Benefits realisation 96
6.2.3 Transition 96
6.2.4 Training and induction 97
6.2.5 Benefits management 97
6.2.6 Managing and realising benefits 97
6.2.7 Benefits and disbenefits 98
6.2.8 Benefits identification and mapping 99
6.2.9 Profiling benefits 102
6.2.10 Realising benefits 104
6.2.11 Reviewing and embedding 105
6.2.12 Communications 106
6.2.13 Sign-off 106
6.2.14 Transition strategy and management 107
6.3 Key roles and responsibilities of this stage 108
6.3.1 Programme sponsor 108
6.3.2 Programme business change manager 108
6.3.3 Programme business realisation manager 109
6.3.4 Programme manager 109
6.3.5 Programme financial manager 109
6.3.6 Programme management office 109
6.3.7 Programme sponsor's board 109
CHAPTER 7 Stage F: Closure 111
7.1 Purpose of this stage 111
7.2 Key activities of this stage 111
7.2.1 Shutting down the programme 111
7.2.2 Disbanding the programme team 112
7.2.3 Programme closure 112
7.2.4 Preparing for closure 113
7.2.5 Programme review 113
7.2.6 Programme closure 114
7.2.7 Communications 114
7.2.8 Disband programme organisation and supporting functions 114
7.2.9 Sign-off 114
7.3 Key roles and responsibilities of this stage 114
7.3.1 Programme sponsor's board 114
7.3.2 Programme sponsor 115
7.3.3 Programme business change manager 115
7.3.4 Programme manager 115
7.3.5 Programme financial manager 116
7.3.6 Stakeholder/communications manager 116
7.3.7 Programme management office 116
7.3.8 Health and safety manager 116
7.3.9 Sustainability manager 116
APPENDIX AProgramme Delivery Matrix 117
A.1 Background 117
A.2 Use of the Programme Delivery Matrix 117
APPENDIX B Tools and Techniques 119
B.1 Background 119
B.1.1 Stage review process 119
B.1.2 Planning poker 120
B.1.3 Managing work products using agile methods 122
B.1.4 Managing the time schedule 122
B.1.5 Burndown charts 124
B.1.6 Media wall 124
B.1.7 Managing the programme scope 125
B.1.8 Three-point estimating 126
B.1.9 Reference class forecasting - example 127
APPENDIX CTemplates 131
C.1 Vision statement 131
C.1.1 Overview 132
C.1.2 Business context 132
C.1.3 Strategic need 132
C.1.4 Programme vision 132
C.1.5 Constraints and limitations 132
C.2 High-level programme scope 132
C.3 Programme mandate 132
C.3.1 Business need/vision statement 133
C.3.2 Outcomes 133
C.3.3 Next steps 133
C.3.4 Sign-off 133
C.4 Programme brief 133
C.4.1 Programme vision 134
C.4.2 Financial benefits 134
C.4.3 Non-financial benefits 134
C.4.4 Disbenefits 134
C.4.5 Programme activity and projects 134
C.4.6 Quick wins 134
C.4.7 Key risks and issues 134
C.4.8 Financial information 135
C.4.9 Financial costs 135
C.4.10 Constraints 135
C.4.11 Assumptions 135
C.4.12 Programme capability 135
C.4.13 Sign-off 135
C.5 Business case 136
C.5.1 Contents 136
C.5.2 Appendices 136
C.5.3 Executive summary 137
C.5.4 Strategic case 137
C.5.5 Economic case 137
C.5.6 Commercial case 138
C.5.7 Financial case 138
C.5.8 Management case 138
C.6 Monthly programme report 139
C.7 Programme highlight report 139
C.7.1 Programme Detail 141
C.8 Benefits profile 142
C.8.1 Sign-off 142
C.9 Tracking benefits: benefits-monitoring 143
C.10 Programme closure report 143
C.10.1 Context 143
C.10.2 Delivery 143
C.10.3 Benefits 144
C.10.4 Handover 144
C.10.5 Risks 144
C.10.6 Issues 144
C.10.7 Projects (optional section for premature closure only) 144
C.10.8 Lessons learned 144
C.10.9 Sign-off 145
APPENDIX D Key Roles: Skills and Competencies 147
D.1 Programme manager 147
D.1.1 Main duties 147
D.1.2 Key competencies 148
D.1.3 Key criteria 148
D.2 Programme business change manager 149
D.2.1 Main duties 149
D.2.2 Key competencies 150
D.3 Programme benefits realisation manager 150
D.3.1 Main duties 150
D.3.2 Key competencies 152
D.4 Programme financial manager 152
D.4.1 Main duties 152
D.4.2 Key competencies 153
D.4.3 Key criteria 153
D.5 Head of programme management office 154
D.5.1 Main duties 154
D.5.2 Key competencies 154
D.5.3 Key criteria 155
D.6 Programme risk manager 155
D.6.1 Main duties 155
D.6.2 Key competencies 155
D.6.3 Key criteria 156
D.7 Programme scheduling manager 156
D.7.1 Main duties 156
D.7.2 Key criteria 157
D.8 Programme cost manager 157
D.8.1 Main duties 157
D.8.2 Key competencies 158
D.8.3 Key criteria 158
Bibliography 159
Past Working Group of the Code of Practice for Programme Management 161
Index 163
1 Programme Management in Context
1.1 Introduction
This second edition of the Code of Practice for Programme Management in the Built Environment is a natural development from the first edition and builds on the recently published sixth edition of the highly successful Code of Practice for Project Management for the Built Environment.
The first edition of this Code of Practice defined a programme as:
a collective of related projects coordinated to achieve desired benefits more effectively than when managing them as a group of individual projects.
In this second edition, we retain this definition. In some organisations, programmes are created with a single business case aligned to a set of benefits. While for others, business cases and benefits are defined at project and not programme level. However, in both cases, the projects are delivered as a programme in order to achieve an organisation's strategic objectives more effectively.
We have retained 'for the built environment' because we continue to see many projects that are not solely construction or development-related. For example, if we consider some of the client sectors involved in creating new facilities and/or infrastructure, such as highways, rail, airports, shipping, nuclear, etc., all of these are likely to incorporate projects that are not related to construction. These may include disciplines such as information technology, human resources management (HRM), capacity building, marketing, etc. Indeed, even mainstream construction developments may include similar disciplines as self-contained projects within a programme.
The sixth edition of Project Management continues to provide the relevant guidance and procedural requirements for the successful management of individual projects. This second edition of Programme Management further develops the elements of functionality and procedures specific to the management and successful delivery of a number of related projects within the built environment, focusing at the programme level on the coordinated creation of value, which presents itself as a trade-off in the relationship between (see Figure 1.1):
- (i) Benefits and outcomes (via outputs);
- (ii) Risks and opportunities;
- (iii) Requirements and objectives (incl. cost and time).
Figure 1.1 Programme Delivery Triangle.
1.1.1 Need for programme management in the built environment
When an organisation manages multiple related projects independently, issues such as a lack of willingness to share resources and knowledge or the use of different tools and techniques can limit the ability to monitor and measure performance across the related projects. This gives rise to problems of coordination and control, which will likely lead to outputs, outcomes and benefits becoming misaligned with an organisation's strategic objectives, resulting in the loss of value.
The need for programme management arises when benefits obtained in a coordinated manner are greater than the sum of individual project benefits obtained in isolation. Whereas traditionally a project is measured by the criteria of time, cost and quality, programmes are determined and measured by the strategic objectives and the benefits to the client organisation, which might otherwise not have been realisable had the projects been managed independently. Furthermore, programmes offer the ability to manage resources, risks and opportunities more efficiently across multiple projects. In this sense, programme management is a systematic approach to project grouping for the purpose of achieving benefits without leaving the process to chance.
The need for programme management in the built environment has continued to grow due to a number of factors, including:
- (i) Programmes are being seen as an opportunity to better manage the availability of resources and skills in the industry;
- (ii) There is a growing need for clients and suppliers to integrate government policy into the design and execution of their projects;
- (iii) Programmes are being seen as a way to help transform the industry as a whole, which has continued to struggle with productivity, collaboration and innovation;
- (iv) Programmes are being seen as an opportunity to bring about wider beneficial societal change beyond solely the strategic objectives of the client organisation.
In this context, the construction sector is shifting its focus from products to services, where programmes and their associated projects do not just deliver buildings; they deliver outputs, outcomes and benefits that create the additional value their stakeholders are seeking. This in turn gives firms in the sector a greater opportunity for survival in what is becoming an ever more competitive environment.
The 2012 London Olympics represents a good example of a programme where individual venues, infrastructure, legacy, etc., each represented separate sets of related projects all under the umbrella of the Olympic Delivery Authority (ODA). The ODA was tasked to act as the programme client, with a programme delivery partner, to achieve the desired benefits (including a long-term legacy) that would not have been achieved had they been managed individually. Another example is the UK's High Speed 2 rail infrastructure programme, where, for example, training academies are created to support the development of skills in the sector.
Clients are now seeing a programme of related projects as posing less risk and greater opportunity to achieve strategic objectives than a number of individual projects can when considered alone. Given the scope for variations in terminology and approaches that are possible within the practices of programme management, this Code of Practice establishes a clear and consistent understanding of the processes involved in managing programmes in the built environment, regardless of their size, nature or complexity.
1.1.2 Future programme management in the built environment
As we prepare and publish this second edition society is still emerging from the pandemic, experiencing a bifurcation of global supply chains, high inflation and facing a war on the borders of Europe. These are global issues that are influencing disruptions in energy supply and contributing to a period of economic uncertainty. This is in addition to the environmental challenge, continued developments in the digitalisation of society, and the ongoing emphasis on social value and sustainability through corporate social responsibility (CSR) practices and environment, social and governance (ESG) metrics.
All of these factors are having an influence on the transformation of our industry, from government policy to firm strategies, in ways that point to a current and future state that is more uncertain and in greater flux than we have experienced in recent history. When we look at recent studies in industry transformation,1 what we see is that top-down approaches, such as government policy and firm strategies, are not enough to achieve the transformation that is needed for a more sustainable future. What is emerging is a greater acknowledgement that the practices and routines that practitioners engage in when delivering projects and programmes can have a significant positive and/or negative influence on industry transformation from within the programme or project itself.
In light of this, we see the practice of programme management in the built environment becoming ever more dynamic in nature. This dynamism needs actively organising and managing through the application of this Code of Practice. More specifically, the organisational routines engaged in by the multiple organisations involved in developing and delivering programmes need to be purposefully reproduced every time. This is because we now understand these routines as being the key mechanisms through which an organisation becomes capable of delivering its objectives. As programmes are temporary organisational arrangements (albeit often of a long duration), these routines can only be reproduced once the programme is underway and must continue to be reproduced as the programme moves through its life cycle.
Programme management therefore is no longer simply about adapting a client organisation's capabilities from steady state A to steady state B, but one in which both current state A and future state B are uncertain and in flux. In this sense, programmes cannot be delivered solely through the mindless application of static models of practice, as these models in themselves cannot determine the programme outcomes.2 Programme managers must move away from the assumption that once a particular programme arrangement has been established, it is already, once and for all, capable of delivering the client objectives. While this may seem self-evident, the stagnation of productivity in construction, the lack of investment in firm capabilities and rising concerns about worker welfare suggest otherwise.
This means that programme managers must continuously re-create capable programme organisations by adapting the guidance presented here to the specific situation and timing of both the individual programmes and their projects, as well as the context of the firms (clients, contractors, consultants, etc.) from which the programmes/projects are created.
This draws greater attention to how programme management practices operate at three specific...
System requirements
File format: ePUB
Copy protection: Adobe-DRM (Digital Rights Management)
System requirements:
- Computer (Windows; MacOS X; Linux): Install the free reader Adobe Digital Editions prior to download (see eBook Help).
- Tablet/smartphone (Android; iOS): Install the free app Adobe Digital Editions or the app PocketBook before downloading (see eBook Help).
- E-reader: Bookeen, Kobo, Pocketbook, Sony, Tolino and many more (not Kindle).
The file format ePub works well for novels and non-fiction books – i.e., „flowing” text without complex layout. On an e-reader or smartphone, line and page breaks automatically adjust to fit the small displays.
This eBook uses Adobe-DRM, a „hard” copy protection. If the necessary requirements are not met, unfortunately you will not be able to open the eBook. You will therefore need to prepare your reading hardware before downloading.
Please note: We strongly recommend that you authorise using your personal Adobe ID after installation of any reading software.
For more information, see our ebook Help page.