
Accelerating E-Mobility in Germany
Description
Alles über E-Books | Antworten auf Fragen rund um E-Books, Kopierschutz und Dateiformate finden Sie in unserem Info- & Hilfebereich.
This book tackles the problem of the insufficient and expensive charging infrastructure in Germany. It assesses the lack of charging infrastructure for electric vehicles with regard to regulatory and competition law, as well as economic aspects. The legal solutions proposed here could ultimately serve to offer e-motorists around the country highly efficient and competitively priced charging options.
More details
Other editions
Additional editions

Content
2 - Contents [Seite 8]
3 - Abbreviations [Seite 11]
4 - List of Figures [Seite 12]
5 - List of Tables [Seite 13]
6 - 1 Electromobility-The Current State [Seite 14]
6.1 - 1.1 Introduction [Seite 14]
6.2 - 1.2 Legal Framework [Seite 15]
6.2.1 - 1.2.1 National Measures [Seite 15]
6.2.2 - 1.2.2 European Measures [Seite 17]
6.2.2.1 - 1.2.2.1 Reduction of Greenhouse Gas Emissions [Seite 17]
6.2.2.2 - 1.2.2.2 Promotion of the Use of Energy from Renewable Sources [Seite 18]
6.2.2.3 - 1.2.2.3 Improving Energy Efficiency [Seite 19]
6.3 - 1.3 Advantages of E-Vehicles [Seite 21]
6.4 - 1.4 Problem Description [Seite 22]
6.4.1 - 1.4.1 Conclusion of Contract with the Charging Station Operator [Seite 23]
6.4.2 - 1.4.2 No Free Choice of Energy Supplier [Seite 24]
6.4.3 - 1.4.3 Excessive Pricing [Seite 24]
6.4.4 - 1.4.4 Lack of Charging Infrastructure [Seite 24]
6.4.5 - 1.4.5 Approach to a Solution [Seite 24]
6.5 - References [Seite 24]
7 - 2 Network Access Pursuant to § 20 EnWG [Seite 27]
7.1 - 2.1 The Benefits for the End Consumer [Seite 27]
7.2 - 2.2 Network Access Pursuant to § 20 EnWG [Seite 28]
7.2.1 - 2.2.1 A Brief History [Seite 28]
7.2.2 - 2.2.2 The Basic Structure of Energy Supply in the EnWG [Seite 32]
7.3 - 2.3 The Public Charging Station in the System of the EnWG [Seite 33]
7.3.1 - 2.3.1 Publicly Accessible Charging Station [Seite 33]
7.3.2 - 2.3.2 Rightful Claimant [Seite 34]
7.3.3 - 2.3.3 Obligated Party [Seite 34]
7.3.3.1 - 2.3.3.1 Direct Line [Seite 35]
7.3.3.2 - 2.3.3.2 Closed Distribution System [Seite 36]
7.3.3.3 - 2.3.3.3 Customer Facility [Seite 36]
7.3.3.4 - 2.3.3.4 Facility Sui Generis [Seite 37]
7.3.3.5 - 2.3.3.5 Energy Supply System [Seite 38]
7.3.3.6 - 2.3.3.6 Discussion: The Legislative Purpose [Seite 40]
7.3.3.6.1 - Supply of Electricity for the General Public [Seite 40]
7.3.3.6.2 - Consumer Protection [Seite 40]
7.3.3.6.3 - Effective and Genuine Competition [Seite 41]
7.3.3.7 - 2.3.3.7 Discussion: Interpretation in Conformity with European Law [Seite 44]
7.3.3.7.1 - Applicability of Directive 2009/72/EC [Seite 44]
7.3.3.7.2 - Applicability of Directive 2009/28/EC [Seite 45]
7.3.3.7.3 - Applicability of Directive 2012/27/EU [Seite 45]
7.3.3.7.4 - Applicability of Directive 2014/94/EU [Seite 46]
7.3.3.8 - 2.3.3.8 Interim Result [Seite 48]
7.3.4 - 2.3.4 Balancing Group [Seite 48]
7.3.5 - 2.3.5 No Grounds for Refusal [Seite 48]
7.3.6 - 2.3.6 Result [Seite 51]
7.3.7 - 2.3.7 Excursus: The Tesla Supercharger Network [Seite 51]
7.4 - References [Seite 52]
8 - 3 Charging Stations as "Essential Facilities" [Seite 56]
8.1 - 3.1 The Benefit for the Consumer [Seite 56]
8.2 - 3.2 Network Access Pursuant to Art. 102 TFEU [Seite 57]
8.2.1 - 3.2.1 Dominant Position [Seite 57]
8.2.1.1 - 3.2.1.1 Product Market [Seite 57]
8.2.1.2 - 3.2.1.2 Geographic Market [Seite 59]
8.2.1.3 - 3.2.1.3 Dominant Position [Seite 60]
8.2.1.3.1 - Collective Entity [Seite 60]
8.2.1.3.2 - Market Transparency [Seite 61]
8.2.1.3.3 - Coordination Discipline [Seite 62]
8.2.1.3.4 - Robustness Against the Competition [Seite 62]
8.2.2 - 3.2.2 Abusive Conduct [Seite 64]
8.2.2.1 - 3.2.2.1 New Product [Seite 64]
8.2.2.1.1 - No Otherwise Access [Seite 65]
8.2.2.1.2 - No Duplicability [Seite 66]
8.2.2.1.3 - Refusal Without Justification [Seite 68]
8.3 - 3.3 Capability of Affecting Trade Between Member States [Seite 69]
8.4 - 3.4 Result [Seite 69]
8.5 - References [Seite 70]
9 - 4 Price Abuse Due to Market Dominance [Seite 72]
9.1 - 4.1 Benefit for the Consumer [Seite 72]
9.2 - 4.2 Price Abuse Pursuant to Art. 102 TFEU [Seite 72]
9.2.1 - 4.2.1 Relevant Market [Seite 72]
9.2.2 - 4.2.2 Dominant Position [Seite 73]
9.2.3 - 4.2.3 Abuse of the Dominant Market Position [Seite 76]
9.2.3.1 - 4.2.3.1 Abusive Pricing [Seite 76]
9.2.3.1.1 - Comparable Market Concept [Seite 76]
9.2.3.1.2 - Price-Cost-Analysis [Seite 77]
9.2.3.1.3 - Substantial Markup [Seite 79]
9.2.3.1.4 - Objective Justification [Seite 80]
9.2.3.1.5 - Interim Result [Seite 80]
9.2.3.2 - 4.2.3.2 Price Discrimination Pursuant to Art. 102 TFEU [Seite 81]
9.2.3.2.1 - Exclusionary Conduct Against Charging Station Operators [Seite 81]
9.2.3.2.2 - Exclusionary Conduct Against Roaming Partners [Seite 82]
9.3 - References [Seite 83]
10 - 5 Insufficient Expansion of Charging Stations [Seite 85]
10.1 - 5.1 Benefit for the Final Consumer [Seite 85]
10.2 - 5.2 Relevant Market [Seite 85]
10.3 - 5.3 Market Failure [Seite 86]
10.3.1 - 5.3.1 Current Expansion of the Charging Station Network [Seite 86]
10.3.2 - 5.3.2 Insufficient Expansion in Regard to the Current State [Seite 88]
10.3.3 - 5.3.3 Insufficient Expansion in Regard to the Development Plan [Seite 89]
10.3.4 - 5.3.4 Interim Result [Seite 90]
10.4 - 5.4 Possible Reasons for the Lack of Expansion [Seite 90]
10.4.1 - 5.4.1 High Fixed Costs [Seite 90]
10.4.2 - 5.4.2 Economies of Scope [Seite 92]
10.4.3 - 5.4.3 Chicken-and-Egg-Problem [Seite 92]
10.4.4 - 5.4.4 Low Number of Available Public Places [Seite 93]
10.4.5 - 5.4.5 Interim Result [Seite 93]
10.5 - 5.5 Appropriate Measures [Seite 94]
10.5.1 - 5.5.1 Self-healing Powers of the Market [Seite 94]
10.5.2 - 5.5.2 Public Sponsorship [Seite 94]
10.5.3 - 5.5.3 Public Responsibility [Seite 95]
10.5.4 - 5.5.4 Regulation [Seite 95]
10.5.5 - 5.5.5 Discussion [Seite 95]
10.6 - 5.6 Result [Seite 96]
10.7 - References [Seite 96]
11 - 6 Summary and Proposals [Seite 99]
11.1 - 6.1 Summary [Seite 99]
11.2 - 6.2 Proposals [Seite 101]
11.2.1 - 6.2.1 Legal Classification of the Charging Station [Seite 101]
11.2.2 - 6.2.2 Charging Station as an Allowable Asset Pursuant to the StromNEV [Seite 101]
11.2.3 - 6.2.3 Structure of the Electricity Distribution Systems [Seite 101]
11.2.4 - 6.2.4 Abolishing the Billing Fee [Seite 102]
11.3 - 6.3 Closing Remarks [Seite 102]
11.4 - References [Seite 103]
12 - Annex A-Overview Operators of Charging Stations [Seite 104]
13 - Annex B-Cost Calculation [Seite 106]
System requirements
File format: PDF
Copy protection: Watermark-DRM (Digital Rights Management)
System requirements:
- Computer (Windows; MacOS X; Linux): Use the free software Adobe Reader, Adobe Digital Editions, or any other PDF viewer of your choice (see eBook Help).
- Tablet/Smartphone (Android; iOS): Install the free app Adobe Digital Editions or another reading app for eBooks, e.g., PocketBook (see eBook Help).
- E-reader: Bookeen, Kobo, Pocketbook, Sony, Tolino and many more (only limited: Kindle).
The file format PDF always displays a book page identically on any hardware. This makes PDF suitable for complex layouts such as those used in textbooks and reference books (images, tables, columns, footnotes). Unfortunately, on the small screens of e-readers or smartphones, PDFs are rather annoying, requiring too much scrolling.
This eBook uses Watermark-DRM, a „soft” copy protection. This means that there are no technical restrictions to prevent illegal distribution. However, there is a personalised watermark embedded in the eBook that can be used to identify the purchaser of the eBook in the event of misuse and to provide evidence for legal purposes.
For more information, see our eBook Help page.