
Civil Engineering Quantities
Red Globe Press
6th Edition
Published on 5. June 2001
Book
Paperback/Softback
X, 294 pages
978-0-333-80074-4 (ISBN)
Description
Aimed at civil engineers and quantity surveyors and students of these disciplines in the preparation of bills of quantities.
More details
Edition
6th ed. 2001
Language
English
Place of publication
London
United Kingdom
Publishing group
Bloomsbury Publishing PLC
Target group
College/higher education
Professional and scholarly
Dimensions
Height: 246 mm
Width: 189 mm
Thickness: 17 mm
Weight
599 gr
ISBN-13
978-0-333-80074-4 (9780333800744)
Schweitzer Classification
Other editions
Previous edition

Ivor H. Seeley
Civil Engineering Quantities
Book
05/1993
5th Edition
Palgrave Macmillan
€28.46
Article exhausted; check for reprint
Persons
IVOR SEELEY was long-time editor of the Macmillan Building and Surveying Series, and the author of a number of successful texts within the series.
GEORGE MURRAY was for many years undergraduate course leader at Napier University, and is the author of Measurement of Building Services (Macmillan, 1997).
GEORGE MURRAY was for many years undergraduate course leader at Napier University, and is the author of Measurement of Building Services (Macmillan, 1997).
Content
PART 1: MEASUREMENT THEORY AND PRACTICE.- Scope and Context of Civil Engineering Work Measurement.- Fundamental Principles of CESSM 3.- Measurement Practice and Bill Production.- CESMM 3: Classes A-D: Contract and Preparatory Site Matters.- CESMM 3: Class E: Excavation, Filling and Landscaping.- CESMM 3: Classes F-H: Concrete.- CESMM 3: Classes I-L: Pipework.- CESMM 3: Classes M-O: Metalwork and Timber.- CESMM 3: Classes P & Q: Piling.- CESMM 3: Classes R-T: Roads, Rails and Tunnels.- CESMM 3: Classes U-W: Walling, Painting and Waterproofing.- CESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works.- PART 2: WORKED EXAMPLES.- Demolition and Site Clearance.- Excavation and Filling.- Mass Concrete Retaining Wall.- Precast Prestressed Concrete Beams.- Pumping Chamber.- Sewage Holding Tank.- Pumphouse.- Stone Faced Sea Wall.- Sewer.- Water Main.- Steel-Framed Gantry.- Timber Jetty.- Hybrid Piles.- Quay with Concrete and Timber Piles.- Steel Sheet Piling.- Navigation Lamp Platform.- Estate Road.- Rail Track.- Tunnel.- Sewer Renovation.- Water Main Renovation.