
Project Scheduling with Time Windows and Scarce Resources
Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions
Springer (Publisher)
Published on 11. September 2001
Book
Paperback/Softback
XI, 340 pages
978-3-540-42463-5 (ISBN)
Article exhausted; check for reprint
Description
A project is a unique undertaking or endeavor to be accomplished that can be divided into individual subtasks or activities each of which requires time and scarce resources for its completion. Also there is a desired objective to be attained (for example, minimization of project duration or of variation of resource utilization, or maximization of net present value of the project). Moreover, there are given precedence relationships among activities prescrib ing the order in which activities must be carried out. Project scheduling, in its basic form, consists of finding start times for all activities such that pre scribed resource and precedence constraints are satisfied and an objective function is optimized. Since the concept of a project can be interpreted quite broadly, project scheduling problems arise in a great variety of practical situations. These in clude construction work, the development and introduction of new products, service systems, or software packages, strategic long-term planning in manu facturing and the service sector, emergency planning, and even the conduct ing of political campaigns. Recently, project scheduling has been successfully applied to production and operations management, e.g. make-to-order pro duction in manufacturing and batch production in process industries. Since the late 1950's, network-based planning methods for project sched uling problems have been developed, cf. Elmaghraby (1977) and Moder et al.
More details
Series
Language
English
Place of publication
Heidelberg
Germany
Publishing group
Springer Berlin
Target group
Professional and scholarly
Illustrations
61 s/w Abbildungen
117 figures, 60 tables, references, index
Dimensions
Height: 23.5 cm
Width: 15.5 cm
Weight
520 gr
ISBN-13
978-3-540-42463-5 (9783540424635)
DOI
10.1007/978-3-662-22341-3
Schweitzer Classification
Other editions
New editions

Klaus Neumann | Christoph Schwindt | Jürgen Zimmermann
Project Scheduling with Time Windows and Scarce Resources
Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions
Book
06/2003
2nd Edition
Springer
€160.49
Shipment within 10-15 days
Content
1 Temporal Project Scheduling.- 2 Resource-Constrained Project Scheduling - Minimization of Project Duration.- 3 Resource-Constrained Project Scheduling - Minimization of General Objective Functions.- References.- List of Symbols.- Three-Field Classification for Resource-Constrained Project Scheduling.