
JIT Implementation Manual -- The Complete Guide to Just-In-Time Manufacturing
Volume 5 -- Standardized Operations -- Jidoka and Maintenance/Safety
Hiroyuki Hirano(Author)
Productivity Press
2nd Edition
Published on 27. April 2009
Book
Paperback/Softback
128 pages
978-1-4200-9030-7 (ISBN)
Description
"It is a book for manufacturing companies that are fighting desperately for survival and that will go to any length to improve their factories and overcome the obstacles to success. One could even call this book a 'bible' for corporate survival."
-Hiroyuki Hirano
Known as the JIT bible in Japan, JIT Implementation Manual - The Complete Guide to Just-in-Time Manufacturing presents the genius of Hiroyuki Hirano, a top international consultant with vast experience throughout Asia and the West. Encyclopedic in scope, this six-volume practical reference provides unparalleled information on every aspect of JIT- the waste-eliminating, market-oriented production system. This historic, yet timeless classic is just as crucial in today's fast-changing global marketplace as when it was first published in Japan 20 years ago.
Providing details on how to implement standardized operations in manufacturing, including essential information on how to establish, improve, and preserve standard operations, Volume 5: Standardized Operations - Jidoka and Maintenance/Safety covers the key topic of Jidoka, or human autonomation - essentially how to separate human activity from machine work without producing defects. It also addresses the essential aspects of maintenance in a JIT environment and how to prevent breakdowns. The book includes time-saving information on how to quickly recognize why injuries occur and create a strategy for zero injuries and zero accidents.
-Hiroyuki Hirano
Known as the JIT bible in Japan, JIT Implementation Manual - The Complete Guide to Just-in-Time Manufacturing presents the genius of Hiroyuki Hirano, a top international consultant with vast experience throughout Asia and the West. Encyclopedic in scope, this six-volume practical reference provides unparalleled information on every aspect of JIT- the waste-eliminating, market-oriented production system. This historic, yet timeless classic is just as crucial in today's fast-changing global marketplace as when it was first published in Japan 20 years ago.
Providing details on how to implement standardized operations in manufacturing, including essential information on how to establish, improve, and preserve standard operations, Volume 5: Standardized Operations - Jidoka and Maintenance/Safety covers the key topic of Jidoka, or human autonomation - essentially how to separate human activity from machine work without producing defects. It also addresses the essential aspects of maintenance in a JIT environment and how to prevent breakdowns. The book includes time-saving information on how to quickly recognize why injuries occur and create a strategy for zero injuries and zero accidents.
More details
Edition
2nd edition
Language
English
Place of publication
Portland
United States
Publishing group
Taylor & Francis Inc
Target group
Professional and scholarly
Professional and Professional Practice & Development
Illustrations
55 s/w Abbildungen
55 Illustrations, black and white
Dimensions
Height: 280 mm
Width: 216 mm
Thickness: 7 mm
Weight
348 gr
ISBN-13
978-1-4200-9030-7 (9781420090307)
Copyright in bibliographic data and cover images is held by Nielsen Book Services Limited or by the publishers or by their respective licensors: all rights reserved.
Schweitzer Classification
Other editions
Additional editions

Hiroyuki Hirano
JIT Implementation Manual -- The Complete Guide to Just-In-Time Manufacturing
Volume 5 -- Standardized Operations -- Jidoka and Maintenance/Safety
E-Book
04/2009
2nd Edition
Productivity Press
€49.99
Available for download

Hiroyuki Hirano
JIT Implementation Manual -- The Complete Guide to Just-In-Time Manufacturing
Volume 5 -- Standardized Operations -- Jidoka and Maintenance/Safety
E-Book
04/2009
2nd Edition
Productivity Press
€49.99
Available for download
Person
JIT Management Laboratory, Tokyo, Japan
Content
Standard Operations. Overview of Standard Operations. How to Establish Standard Operations. How to Make Combination Charts and Standard Operations Charts. Standard Operations and Operation Improvements. How to Preserve Standard Operations. Jidoka: Human Automation. Steps toward Jidoka. The Difference between Automation and Jidoka. The Three Functions of Jidoka. Separating Workers: Separating Human Work from Machine Work. Ways to Prevent Defects. Extension of Jidoka to the Assembly Line. Maintenance and Safety. Existing Maintenance Conditions on the Factory Floor. What Is Maintenance? CCO: Three Lessons in Maintenance. Preventing Breakdowns. Why Do Injuries Occur? What Is Safety? Strategies for Zero Injuries and Zero Accidents.