Cover: A Cost-Based Model for Optimising the Construction Logistics Schedules - Open Dissertation Press

A Cost-Based Model for Optimising the Construction Logistics Schedules

Yuan Fang(Author)
Open Dissertation Press
Published on 26. January 2017
Book
Paperback/Softback
234 pages
978-1-361-27708-9 (ISBN)
€65.08incl. 7% vat
Withdrawn from sale

More details

Persons