Productivity Improvement through Time Study Analysis

Practical Implementation
 
 
LAP Lambert Academic Publishing
  • erschienen am 28. Januar 2018
 
  • Buch
  • |
  • Softcover
  • |
  • 188 Seiten
978-613-4-97364-9 (ISBN)
 
This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.
  • Englisch
  • Höhe: 220 mm
  • |
  • Breite: 150 mm
  • |
  • Dicke: 11 mm
  • 296 gr
978-613-4-97364-9 (9786134973649)
6134973645 (6134973645)
Ali Akbar is currently serving as Lecturer in Industrial Engineering and Management department at the Dawood University of Engineering & Technology Karachi, Pakistan.Presently, he is pursuing his MSc in Mechanical Engineering from Universiti Teknologi PETRONAS (UTP) Malaysia.

Sofort lieferbar

64,90 €
inkl. 7% MwSt.
in den Warenkorb

Abholung vor Ort? Sehr gerne!
Unsere Web-Seiten verwenden Cookies. Mit der Nutzung dieser Web-Seiten erklären Sie sich damit einverstanden. Mehr Informationen finden Sie in unserem Datenschutzhinweis. Ok